6 Values
___________________________________________

Location:
Biedronka I – Kostrzyn, Poland

Logistics facility:
19,300 sq. m

Offices:
750 sq. m

Construction duration:
5 months

Handover:
January 2005
___________________________________________
___________________________________________

Location:
Biedronka II – Wojnicz, Poland

Logistics facility:
20,750 sq. m

Offices:
1,600 sq. m

Construction duration:
5 months

Handover:
October 2007
___________________________________________
Go

IIG constructed two high product throughput distribution centres (DC s) for Jerónimo Martins/Biedronka, in Kostrzyn and Wojnicz. The locations of these DC s were determined by supply chain analyses carried out by IIG, which planned the company’s optimum DC network. The warehouses are each equipped with fifty loading docks, and the Kostrzyn facility includes a 1,000 sq. m deep freeze cold storage area.

IIG supply chain analyses led to an overall 32% reduction in transport and warehousing costs. Jerónimo Martins is a large Portuguese food distribution and manufacturing company, which owns the Biedronka chain of more than one thousand retail stores in Poland, and has hailed its Kostrzyn warehouse as one of the most modern in Europe.

The strategic location and the optimized interior layouts of Biedronka’s two IIG designed distribution centres are the sources of significant operational savings

Keep in touch
WE SHAPE YOUR NEEDS.
Jerónimo Martins/Biedronka I and II

 

 

 

THE SMARTEST TAILOR-MADE INDUSTRIAL REAL ESTATE.
IIG Immo Industry Group (HQ) - Industrielaan 27 - 9300 Aalst - Belgium - Tel : +32 53 76 78 50 - Fax : +32 53 76 78 51 - Copyright © 2007 IIG
Disclaimer